Holiday Closure: The Testing Center will close at noon on Friday, May 22, and will reopen on Tuesday, May 26.
Introduction to Pipe Welding (WLDG 1535)
Term: 2015-2016 Spring
Mon-Tue-Wed-Thu-Fri, 7:00 AM - 8:30 AM (1/11/2016 - 5/12/2016) Location: MAIN CECA 103
An introduction to welding of pipe using the shielded metal arc welding process, including electrode selection, equipment setup, and safe shop practices. Emphasis on weld positions 1G and 2G welds using various electrodes.