The Testing Center will be closed from March 15-22 for Spring Break and will reopen on Monday, 3/23.
Advanced Pipe Welding (WLDG 2553)
Term: 2016-2017 Summer
Mon-Tue-Wed-Thu-Fri, 11:30 AM - 12:30 PM (5/22/2017 - 8/10/2017) Location: MAIN CECA 103
Advanced topics involving welding of pipe using the shielded metal arc welding process. Topics include electrode selection, equipment setup, and safe shop practices. Emphasis on weld positions 5G and 6G using various electrodes.