The Testing Center will be closed from March 15-22 for Spring Break and will reopen on Monday, 3/23.
Intro to Gas Tungsten Arc Welding (WLDG 1434)
Term: 2014-2015 Fall
Principles of gas tungsten arc welding (GTAW), including setup, GTAW equipment, and instruction in various positions and joint designs.