The Testing Center will be closed from March 15-22 for Spring Break and will reopen on Monday, 3/23.
Intro to Shielded Metal Arc Welding (WLDG 1428)
Term: 2019-2020 Fall
Mon, 12:00 PM - 12:50 PM (9/3/2019 - 5/15/2020) Location: *
An introduction to the shielded metal arc welding process. Emphasis placed on power sources, electrode selection, oxy-fuel cutting, and various joint designs. Instruction provided in SMAW fillet welds in various positions.