The Testing Center will be closed from March 15-22 for Spring Break and will reopen on Monday, 3/23.
Application of Industrial Automatic Controls (INTC 1443)
Term: 2025-2026 Spring
Wed-Thu, 8:00 AM - 3:00 PM (1/12/2026 - 5/15/2026) Location: MAIN WF IECL1
A study of automatic process control including measuring devices, analog and digital instrumentation, signal transmitters, recorders, alarms, controllers, control valves, and process and instrument drawings. Includes connection and troubleshooting of loops. Prerequisite: INTC 1441.