Air Conditioning Install & Startup (HART 2338)
Term: 2016-2017 Fall
Mon-Tue-Wed-Thu, 5:30 PM - 8:30 PM (8/22/2016 - 12/15/2016) Location: MAIN CEC 201
A study of air conditioning system installation, refrigerant piping, condensate disposal, and air cleaning equipment with emphasis on startup and performance testing.