The Testing Center will be closed from March 15-22 for Spring Break and will reopen on Monday, 3/23.
HVAC Duct Fabrication (HART 1000)
Term: 2025-2026 Winter CBE
Mon-Tue-Wed-Thu-Fri, 11:30 AM - 3:30 PM (12/1/2025 - 2/28/2026) Location: FC
Layout and fabrication of HVAC duct systems using common tools and equipment of the trade.